x

FG’s N1.3trn electricity intervention fund didn’t produce significant result – Zainab Ahmed

Zainab Ahmed, minister of finance, budget and planning, says the N1.3 trillion intervention fund the federal government provided for the power sector has not yielded any significant result.

On March 1, 2017, the federal government approved the sum of N701 billion as a power assurance guarantee fund for the Nigerian Bulk Electricity Trader (NBET) to pay for the electricity produced by the generation companies (GenCos) to the national grid for the period of two years.

The fund was provided to tackle the monthly liquidity challenges faced by GenCos, as the distribution companies (DisCos) keep defaulting in paying for the monthly invoice of electricity received.

In a letter to President Muhammadu Buhari dated November 19, 2021, Zainab Ahmed, minister of finance, detailed how funds can be raised through the sale of make-up gas to address the financial challenges in the sector.

“The industry requires N85 billion per month to pay for gas, generation, transmission and distribution operations,” the minister wrote.

“Recent intervention (between 2017-2019) towards addressing the power sector problem includes the 701 billion and 600 billion payment assurance facilities (PAFs) secure from Central Bank of Nigeria (CBN) to take care of some of the FG contingent liabilities within the sector and which have not yielded significant result.

“Shortfalls caused by the large difference between allowed tariffs and what is required for cost recovery cost the FGN a total sum of N1.249 Billion between 2017 to 2019. These resources are more needed for human capital development and infrastructural investment. The above includes some projects like the World Bank loan (up to $3 billion) for tariff shortfall and the euro 2.6 billion for the presidential power initiative is considered to support Nigerian Electricity Supply Industries (NESI).”

The minister also stated how Nigeria paid $137 million in two years for gas and electricity that were never used in the “take or pay deal” the country entered into with some investors in the power sector.

Hot this week

Kidnappers Kill Traditional Ruler in Kanam LGA of Plateau

By Israel Adamu, Jos Gunmen suspected to be kidnappers have...

Gov Mutfwang Commissions New JMDB Market to Empower Women Traders

By Isreal Adamu, Jos Plateau State Governor, Caleb Mutfwang, has...

Kaduna ADC Stakeholders Petition Police Commission, Demand Probe of El-Rufai

By Achadu Gabriel, Kaduna Stakeholders of the African Democratic Congress...

World Cup Qualifier: NFF Slams Dessers, Faults Troost-Ekong After Eagles’ Draw With South Africa

The Nigeria Football Federation (NFF) has sharply criticised Super...

Bandits Killings: S/Kaduna Kicks as Gov Sani Flags Off Makarfi Rural Roads

By Achadu Gabriel, Kaduna The flag-off of a rural road...

Gov Sule Hands Over Headquarters Complex to North Central Development Commission in Lafia

By Israel Adamu, Jos Nasarawa State Governor, Engr. Abdullahi Sule,...

Kogi Govt Vows to Clamp Down on Youth Aiding Bandits

By Noah Ocheni, Lokoja The Kogi State Government has warned...

8th Zenith Bank/Delta Principals’ Cup Kicks Off September 18

By Anne Azuka The 8th edition of the Zenith Bank/Delta...

Kaduna ADC Stakeholders Petition Police Commission, Demand Probe of El-Rufai

By Achadu Gabriel, Kaduna Stakeholders of the African Democratic Congress...

China Commissions 14th Chinese Corner in FCT School

The Chinese Embassy in Nigeria on Tuesday inaugurated a...

Governor Sule and the Two Horsemen: How Synergy Is Redefining Governance in Nasarawa

By Leo Zwanke, Lafia When Engineer Abdullahi Sule assumed office...

Related Articles

Popular Categories

spot_imgspot_img