News
Umahi Inspects Lekki Port Access Road, Directs Accelerated Work
The Minister of Works, Senator David Umahi, has carried out an on-site inspection of the Lagos 7th Axial Road, also known as the Lekki Port Access Road, reaffirming the Federal Government’s resolve to deliver the strategic infrastructure within schedule.
The inspection saw the Minister review ongoing construction works alongside senior officials and technical teams from China Harbour Engineering Company (CHEC), the contractor handling the project.
The Lagos 7th Axial Road is regarded as a key logistics corridor designed to support maritime and industrial operations, particularly around the Lekki axis. During the tour, Umahi examined various construction segments, evaluating engineering methods and structural frameworks being implemented across the site.
Addressing journalists after the inspection, the Minister expressed satisfaction with the pace and progress of work, noting visible improvements in site organisation and expansion of active construction fronts.
He commended the standard of construction and quality control measures observed, describing them as consistent with expectations for a project of national importance. He urged the contractor to sustain and even increase the current tempo to ensure timely delivery.
Umahi directed the project team to intensify equipment deployment and maintain strict adherence to construction quality benchmarks across all sections of the road.
On the technically sensitive Lagoon Section (Lot 1), the Minister provided clarity on the final design approach. He announced that the original bridge design would be retained, following joint geotechnical investigations and soil analysis conducted by the Federal Ministry of Works, independent consultants and CHEC engineers. The decision, the minister explained, followed extensive technical and cost evaluations of alternative proposals.
The Lagos 7th Axial Road is expected to play a transformative role upon completion. The highway is projected to ease cargo evacuation, reduce logistics costs and strengthen Nigeria’s trade competitiveness because of its primary access route to the Lekki Deep Sea Port and adjoining Free Trade Zones.
For residents and businesses along the Lekki-Epe corridor, the project promises to alleviate persistent traffic congestion, improve mobility and enhance economic activity in the area.
Beyond easing transportation challenges, officials say the road will stimulate industrial growth, attract foreign direct investment and generate employment opportunities, further consolidating Lagos’ position as a leading commercial centre in Africa.
Umahi reiterated the Federal Government’s commitment to addressing any operational or external challenges that may arise, assuring stakeholders that necessary support would be provided to ensure the successful and timely completion of the project.
News
Tinubu Commends China Harbour Over Progress on Shabu–Lafia–Makurdi Bypass
By Abel Leonard
The Federal Government has commended China Harbour Construction Company for prioritizing the completion of the Shabu-Lafia-Makurdi Federal Highway bypass project in Lafia, Nasarawa State capital.
The commendation was made on Thursday during a media tour of the project site. Federal Controller of Works, Mr. Manri Ishiaku, representing Minister of Works, David Umahi, praised China Harbour Engineering Company for keeping its promise to deliver the project on time.
Ishiaku explained that the bypass project, linking Shabu in Lafia to Makurdi in Benue State, had been abandoned before the current government revived it. President Tinubu had approved its completion shortly after taking office, demonstrating strong political will.
“This project started in the last administration but was abandoned. President Bola Ahmed Tinubu approved its completion immediately,” he said. “In under a year, it’s almost done, showing this administration’s commitment to infrastructure development.”
The Federal Controller commended China Harbour Engineering Company, (CHEC), for delivering quality work on schedule. “The contractor has kept its promise and can be trusted to deliver projects as specified and on time,” he said.
Nasarawa State Commissioner for Works, Hon. Muazu Adamu Gosho, said the state government supports federal infrastructure projects, noting the bypass will ease traffic congestion in Lafia and improve connectivity.
China Harbour’s Site Engineer, Mr. Tijani Olalekun, said construction is nearing completion, with finishing touches ongoing. “We’ll substantially complete the project next week,” he said, thankging the Federal Ministry of Works and Nasarawa State Government for their support.
The Shabu-Lafia-Makurdi bypass is expected to reduce traffic congestion in Lafia and improve transportation between Nasarawa and Benue states.
News
Umahi Tours Lekki Corridor’s 7th Axial Road Project, Praises CHEC’s Progress
By Wilfred Framcis
Lagos, Nigeria – Minister of Works Senator Dave Umahi has expressed confidence in China Harbour Engineering Company Limited (CHEC) to deliver the 7th Axial Road project in the Lekki Corridor of Lagos. The project, a key cargo handling route for the Lekki Deepwater Port, is being constructed behind the Dangote Refinery and connects the Lekki Corridor with the Sagamu route.
During his inspection tour, Umahi praised CHEC for its successful delivery of the Lekki Deepwater Port and the high-quality progress on the Makurdi-Enugu road reconstruction and expansion project. He instructed that the roadbed filling work for Project LOT1 be completed by the end of April and directed the project team to accelerate resource input and tangible works to meet the deadline.
The 7th Axial Highway is expected to complement key infrastructure projects like the Coastal Road, Dangote Road, and Lekki Port, creating a comprehensive transportation hub model and boosting Nigeria’s port economy and industrial corridor. Umahi emphasized the need for environmental protection agencies to ensure efficient construction and steady progress while maintaining ecological safety.
A CHEC representative stated that the company would maintain a high level of resource input, implement the Minister’s directives, and coordinate safety, quality, and environmental protection to ensure the project’s timely and high-quality completion.
News
Omo-Agege Calls for Probe Into PTI Meeting Attack, Warns Against Political Violence in Delta
By Anne Azuka
Former Deputy President of the Senate, Senator Ovie Omo-Agege, has called for a thorough investigation into the disruption of a political meeting at the Petroleum Training Institute (PTI) Conference Centre in Effurun, Delta State, warning that rising political violence could affect the credibility of the 2027 general elections.
In a statement issued by his Special Adviser on Strategy and Communications, Godwin Anaughe, Omo-Agege condemned the reported attack on an APC Delta Central leaders and stakeholders’ meeting, where suspected thugs allegedly disrupted proceedings and injured the Delta State Government’s Senior Special Assistant on Protocol, Temple Mudi.
The former senator described the incident as a threat to democratic participation and urged security agencies to identify and prosecute those responsible. He also appealed to political actors to embrace peaceful engagement.
Omo-Agege further referenced an earlier incident involving Nigeria Democratic Congress (NDC) governorship candidate Deacon Chris Iyovwaye, who he said was allegedly prevented from accessing his community’s town hall in Agholokpe. He urged authorities to investigate both incidents.
He specifically called on the Delta State Police Command, the Department of State Services (DSS), and the Inspector-General of Police to conduct comprehensive investigations. He also appealed to the Independent National Electoral Commission (INEC), civil society organisations, and the international community to monitor political developments in Delta State.
Omo-Agege reaffirmed his commitment to peaceful democratic participation, stating that violence should not be allowed to undermine the electoral process.
-
News7 hours agoGroup Urges Gov. Yusuf to Appoint Ahmad Tijjani Abdullahi to Kano Executive Council
-
Uncategorized16 hours ago
Oriire Kidnap: FG Arraigns Ansaru Commanders, Mahmuda, Abu Baraa and The Three New Suspects Arrested By DSS On Fresh Charges of Terrorism, Murder of Teachers
-
Uncategorized16 hours ago
Breaking: FG Arraigns ‘BOSYA President’ Kaigama For Terrorism
-
News7 hours agoZulum Stops Convoy to Buy Peanuts From Roadside Trader During Borno Community Visit
-
News22 hours agoCoalition Raises Questions Over Key Claims in Amachree’s Book
-
News7 hours agoUba Sani Names KADIRS Chairman Jerry Adams as Running Mate for 2027 Governorship Election
-
Uncategorized4 hours ago
Lekki 7th Axial Road: Umahi commands CHEC, confident of timely delivery
-
Politics17 hours agoAPC URGED TO UPHOLD AND RESTORE DANKAKA’S SENATORIAL CANDIDACY FOR KWARA SOUTH

You must be logged in to post a comment Login