x

Electricity: GenCos fail to generate 3,067.5 megawatts due to gas shortage

Must read

Electricity Generation Companies (GenCos) comprising gas-fired and hydro stations have attributed their inability to generate 3,067.5 megawatts of electricity on Monday to unavailability of gas.

This information was disclosed in a daily energy report by the Advisory Power Team, Office of the Vice President in Abuja on Tuesday.

The report also noted that 135.4 megawatts of electricity was not generated due to unavailability of transmission infrastructure during the period.

It said that 1028.5 megawatt was not generated due to high frequency resulting from unavailability of distribution infrastructure.

The report, however, said the GenCos released an average of 3,908 MegaWatts per Hour of electricity into the national grid on Monday.

It said the electricity sent out by the GenCos was down by 21.72 megawatts from the 3,929 released on Sunday.

The report said that 245 megawatts was recorded as loses due to water management procedures.

The report revealed that the power sector lost an estimated N2,149 billion on Monday due to insufficient gas supply, distribution and transmission infrastructure.

On sector reform and activities, it said that the dominant constraint for Monday was unavailability of gas.

The report said the peak generation attained on Monday was 4,658.5 megawatts.. (NAN)

Copyright DAYBREAK NIGERIA.

All rights reserved. This material, and other digital content on this website, may not be reproduced, published, broadcast, rewritten or redistributed in whole or in part without prior express written permission from DAYBREAK NIGERIA.

More articles

1506 COMMENTS

LEAVE A REPLY

Please enter your comment!
Please enter your name here

- Advertisement -

Latest article