x

Wike reiterates commitment to compelet Abuja 13km ISEX Road infrastructure by December 2024

By Joyce Remi-Babayeju

The FCT  Minister , Barr. Ezenwo Nyesom Wike has reiterated his commitment to complete by December 2024 the construction of the Inner Southern Expressway (ISEX).

 Wike  made this known in Abuja on Monday, January 29, 2024, when he visited the project sites of the Inner Southern Expressway (ISEX), a 13km stretch of road from the Southern Parkway around the Christian Centre and CBN in the Central Business District to the Galadimawa Interchange.

The minister described the road project as very ambitious and capable of changing the landscape of the city, assured that it would be completed  with adequate funding.

Wike inspected the 15km Left Hand Services Carriageway of the Outer Southern Expressway Stage II, from Ring Road I Junction (by Apo Roundabout) to Wasa Junction Abuja, adding that the expressways, when completed, will decongest traffic within the Abuja city centre.

Addressing journalists after the projects inspection said, “We first went to the Inner Southern Expressway, and then we are now on the Outer Southern Expressway. The importance of these two major contracts, they will do a lot to decongest the traffic you see very frequently along this road.”

 The Executive Secretary, FCDA, Engr. Shehu Ahmad Hadi in his overview of the infrastructural projects explained that the full scope of development of ISEX stretches from AYA Roundabout to meet the OSEX in Kuje.

He explained that the minister visited the 10 kilometer stretch of road from the Southern Parkway to the Ring Road II, around Galadimawa interchange.

Hot this week

Trump Envoy Urges FIFA to Replace Iran with Italy at World Cup

An envoy linked to Donald Trump has reportedly proposed...

Women Group Applauds Olukoyede, Seeks Collaboration in Fight against Corruption

By Francis WilfredThe President, Women Community in...

Wike Appoints Musa Idris As New Aide on Procurement

By Joyce Remi- BabayejuThe Minister of the Federal Capital...

Why I Anointed Engr Gubio as My Successor – Gov Zulum

By Achadu Gabriel, KadunaBorno State Governor, Prof. Babagana Umara...

Beyond the old stories

There is something fundamentally flawed with the operations of...

Group Petitions Gov Ododo Over Abandoned Idah Township Roads Project

From Noah Ocheni, LokojaResidents of Idah have called on...

Why I Anointed Engr Gubio as My Successor – Gov Zulum

By Achadu Gabriel, KadunaBorno State Governor, Prof. Babagana Umara...

Beyond the old stories

There is something fundamentally flawed with the operations of...

Oborevwori Advocates Inclusive Governance as Path to National Unity

By Anne AzukaDelta State Governor, Rt. Hon. Sheriff Oborevwori,...

APC 2027: Ex-IGP, Adamu Insists on Direct Primaries, Rejects Imposition

From Abel Zwanke, Lafia The campaign team of a frontline...

Accelerate Work, Timelines Non-Negotiable – Tarabina Tells Contractors

The Chairman of the Bayelsa State Directorate for Project...

Kogi Works Commissioner Visits Umahi, Seeks Stronger Collaboration on Federal Roads

From Noah Ocheni, LokojaThe Kogi State Commissioner for Works,...

Shi Jin Quarry Strengthens Safety Measures to Protect Host Communities

By Jabiru HassanShi Jin Quarry, located in Dagarma, Zaura...

Related Articles

Popular Categories

spot_imgspot_img