x

Contractors on East-West and Sections of Benin-Sapele-Warri Roads Praised for Great Work

By Jabiru Hassan, Kano

The Honourable Minister of Works, Sen. (Engr.) David Nweze Umahi, CON, FNSE, FNATE, has emphasized that the adoption of Continuous Reinforcement Concrete Pavement (CRCP) technology on roads in flood-prone areas, particularly those with high water tables and heavy traffic, is a significant step forward for Nigeria.

Senator Umahi made this statement while inspecting the ongoing reconstruction of a 2.46-kilometre Special Intervention Project on the East-West Road in Delta State (CH.28+400-CH.50+300) on Tuesday, 18th February 2024. The project is being handled by M/S Truetech Global Investment Services Limited.

The Minister praised the technology’s benefits, noting that roads built with concrete will last between 50 to 100 years, while asphalt roads typically last only about 10 years. He highlighted that concrete is ideal for flood-prone roads, emphasizing its durability and suitability for areas with high rainfall and traffic volumes.

“It’s the best thing for Nigeria, especially in regions with high water tables,” Umahi remarked, reiterating President Bola Ahmed Tinubu’s commitment to prioritizing roads along the nation’s economic corridors.

During the inspection, the Minister interacted with youth and community leaders in the project areas. They expressed satisfaction with the quality of work and requested that more projects be extended to their communities. Motorists and commuters also praised the ongoing work, noting the improvements made to previously dilapidated roads, which are now providing better value for taxpayers’ money.

Other ongoing projects inspected by the Minister include:

  • 110.63 km Dualisation of Sapele – Agbor – Ewu Road (Section I: Sapele – Agbor), being handled by Messrs CGC (Nig) Ltd.
  • 83.3 km Rehabilitation of Asaba-Agbor Dual Carriageway, Edo State Border, managed by Messrs Hartland (Nig) Ltd.
  • 23.2 km Reconstruction of Benin-Sapele-Warri Dual Carriageway, Section III (Ibada Elume – Warri), under the Road Infrastructure Development and Refurbishment Investment Tax Credit Scheme, contracted to M/S Skecc (Nig.) Ltd.

Engr. Umahi urged the contractors to expedite their work, stressing that President Tinubu is eager to see the projects completed, as he is determined to alleviate the hardships faced by Nigerians due to poor road conditions. The Minister also called for cooperation and understanding as the government continues its efforts to improve Nigeria’s road infrastructure.

Hot this week

Salem University Lokoja to Graduate 168 Students at 7th Convocation Ceremony

By Noah Ocheni, LokojaSalem University, Lokoja, is set to...

Shun Political Distractions, Wike Tells SSDC Board

By Joyce Remi-BabayejuThe FCT Minister Barr. Nysome Wike...

Nigeria, Chinese Firm Sign Deal to Deploy 500 CNG Stations Nationwide

The Midstream and Downstream Gas Infrastructure Fund (MDGIF) have...

NIM Yenagoa Hosts Maiden Quiz Competition, Career Day; Urges Students to Pursue Passion-Driven Careers

By Amgbare Ekaunkumo, YenagoaThe Nigerian Institute of Management (NIM)...

Catholic Church Official Abducted in Southern Kaduna Amid Fresh Attacks

By Achadu Gabriel, KadunaA Catholic Church official, Mr. Thomas...

Iorpev Rates Governor Alia High on Education, Infrastructure, Healthcare and Economic Development

By Isaac Kertyo, MakurdiChief Solomon Iorpev, the Technical Adviser...

The Role of African Media in Shaping Perceptions of the Gaza Conflict

Anita Chidiogo IchekaThe Gaza conflict has once again forced...

Related Articles

Popular Categories

spot_imgspot_img